Flooring and Cladding Replacement in a Ramat Poleg Apartment
Flooring and cladding replacement in a Ramat Poleg apartment, including removal of existing finishes, substrate preparation and levelling, new flooring, skirting and grout, followed by paint and finish repairs.
The project replaced worn flooring while protecting existing elements and maintaining accurate transitions between rooms.
Surface preparation and level control were completed before the new tiles were installed.We performed a complete replacement of flooring and cladding, including dismantling the old materials and removing construction waste. A foundation was prepared with leveling and repairing surfaces, and sealing in wet areas as needed. New flooring was laid while maintaining straight lines and uniform seams, along with precise wall cladding, including cuts around outlets and faucets. The work was completed by filling seams, cleaning up adhesive and finish residues, and general cleaning of the area. The result: new, uniform and meticulous flooring and cladding, which upgrade the appearance of the space.
The challenge
The existing floor had height differences and several sensitive connections to doors and fixed elements.
The solution
We removed the old finish, corrected the base, planned transition points and installed the new flooring with consistent joints and skirting.
The result
The apartment received a continuous, level floor and a cleaner, more unified appearance.
Project gallery
Images documenting the work stages and finishing quality.
Flooring Replacement in Ramat Poleg — stage 1
Flooring Replacement in Ramat Poleg — stage 2
Flooring Replacement in Ramat Poleg — stage 3
Services included in this project
Planning a renovation in Netanya?
Tell us about the property, scope and goals. We will review the project and contact you to arrange an introductory conversation and a structured quotation.